Explore how an eco-living village could present its plan, budget, packages and delivery evidence in one funding record.
Project preview1 / 3 Illustrative imagery. These images are not evidence of project delivery.
Housing in this region has become unreachable for the people who keep it running — the bakers, the teachers, the carers. GreenHouse gives 14 households a place to live with shared infrastructure, a market garden and a workshop. It's small enough to actually finish, big enough to matter. Backers don't get equity — they get a credit they can spend at the village, a record of helping it happen, and quarterly proof of where the money went.
This illustrative record models a 14-home community build outside Zurich, designed for low-impact living and shared space. It shows how modular timber-frame homes, a market garden, a shared workshop and a renewable-energy plan could be explained before a project is allowed to accept support.
Compare what is included and when it is expected. These are example packages; no live payments are available.
Project updates, supporter wall, contribution receipt
CHF 275 credit for stays, dinners or workshops at the village
Founding status, private preview weekend, priority booking for life
Each allocation remains attached to the project record so material changes can be explained during delivery.
Modular frames, foundations, on-site labour
Solar arrays, heat pumps, water systems
Site management, project coordination
Permits, audits, registration
Contingency held for milestone variance
See the active stage, the evidence required to complete it and the next condition before opening the full record.
Site prep documentation, foundation pour proof, weekly photo update
Inspection report, certificate of occupancy
Land deed, building permit, zoning approval
Architectural plans, signed supplier contracts
Site prep documentation, foundation pour proof, weekly photo update
Inspection report, certificate of occupancy
Public open day, launch report
Delivery confirmations, backer receipts
8 public metadata records · 10 protected placeholders · 7 of 7 checks in a reviewed state.
Founder ID + business registration cross-checked
GmbH on file in commercial register
Budget reviewed against supplier quotes and historical builds
18 supporting documents in the document vault
Build plan and timeline reviewed by BackThisBuild team
Operator commits to bi-weekly milestone updates
Construction and liability insurance certificate uploaded
A review is not a promise of success. The record keeps delivery risks beside the operator's mitigation plan.
Construction projects can shift. Our buffer assumes 4–6 weeks of weather risk during winter.
10% reserve buffer held against milestone variance.
Modular frames depend on a single primary supplier. A backup is qualified but adds 8% to material cost.
Backup supplier pre-qualified and on file.
Dated operator notes stay connected to the milestone and evidence they describe.
Final permit signed on April 9. Documents are in the vault. Site prep contractor confirmed for week of June 3.
Illustrative update: a three-supplier setup is recorded for modular frames, solar arrays and water systems. A real launch would require the underlying contracts and payment controls to be independently verified first.
Crew arrives June 3 for two weeks of ground prep. Daily photo updates will go to backers via the supporter dashboard.
Update requests are stored only on this device while signed-in delivery is being tested.
Answers remain attached to the project record so every supporter can review them.
Vouchers activate at milestone 4 (Launch readiness). You'll receive the credit as a redeemable code valid for two years from issue.
The homes are not for sale — they are part of a long-term lease model managed by the village. Backing the build doesn't grant a unit, but Founding Backers get priority on the resident waitlist for the second phase.
We publish a quarterly energy report showing kWh generated vs consumed on-site. The first report goes to backers within 90 days of launch.
Lena RüeggCo-founder & Head of Build · GreenHouse Developments GmbH
Swiss-based developer building modular, low-impact community housing. Three completed builds across Switzerland and Austria, all delivered on or near milestone schedule.
Open operator profile“We've spent seven years figuring out how to build housing that's actually good for the land it sits on. GreenHouse Eco Village is the build we've been working toward.”
Compare what each level includes, when it would be delivered and which milestone it depends on.
Review support levels